IT Pro is supported by its audience. When you purchase through links on our site, we may earn an affiliate commission. Learn more

Ofcom unveils Olympics spectrum sharing plans

The Ministry of Defence is one Governmental body which will be giving up some of its spectrum to support massive demand during the Olympic Games.

Olympics

Public sector bodies in London are to relinquish some of their spectrum in order to support capacity demands for the Olympics.

Ofcom today revealed organisations, including the Ministry of Defence, will loan out their spectrum on a short-term basis to cater for the massive bandwidth demands the Olympics will bring.

Spectrum freed up by the switchover to digital TV will also be used, the regulator said.

The 2012 Olympic Games will require up to 20,000 separate wireless frequency assignments, more than double the number usually needed in a whole year, Ofcom said.

We are working behind the scenes to make this capacity available, to ensure that this demand is met.

The smooth running of coverage of the Games will need plenty of spectrum. Alongside a massive amount of mobile phone and tablet use during the event, wireless cameras and microphones, walkie-talkies, timing and scoring systems as well as sports commentary technologies will all soak up bandwidth.

"The UK's airwaves are already among the most intensively used in the world. The London 2012 Games will significantly increase demand," said Ofcom's chief operating officer Jill Ainscough. "Ready and prepared for this challenge, Ofcom recognises that there is no room for complacency. We are working behind the scenes to make this capacity available, to ensure that this demand is met."

Ofcom has also designed a spectrum assignment system to ensure interference is kept to a minimum by carefully managing who is using what spectrum.

A sensor network covering the entire country has been built to identify any potential interference issues.

Ofcom has employed a sizeable team of engineers to deal with any interference too.

Ofcom is preparing for a busy year. The regulator is currently in the process of consulting with telecoms firms over the 4G auction, scheduled to take place at the end of the year.

Read on for IT Pro's report from behind the scenes at the Olympic IT control centre.

Featured Resources

Meeting the future of education with confidence

How the switch to digital learning has created an opportunity to meet the needs of every student, always

Free Download

The Total Economic Impact™ of IBM Cloud Pak® for Watson AIOps with Instana

Cost savings and business benefits

Free Download

The business value of the transformative mainframe

Modernising on the mainframe

Free Download

Technology reimagined

Why PCaaS is perfect for modern schools

Free Download

Recommended

Paessler PRTG Network Monitor 21.4 review: Hard to beat
Network & Internet

Paessler PRTG Network Monitor 21.4 review: Hard to beat

15 Mar 2022
Best paying tech jobs of 2022
Careers & training

Best paying tech jobs of 2022

10 Mar 2022
Edge-to-cloud security webinar
Whitepaper

Edge-to-cloud security webinar

8 Mar 2022
Edge-to-cloud security webinar
Whitepaper

Edge-to-cloud security webinar

8 Mar 2022

Most Popular

How to boot Windows 11 in Safe Mode
Microsoft Windows

How to boot Windows 11 in Safe Mode

7 Jun 2022
Delivery firm Yodel disrupted by cyber attack
cyber attacks

Delivery firm Yodel disrupted by cyber attack

21 Jun 2022
Attracting and retaining talent through training
Sponsored

Attracting and retaining talent through training

13 Jun 2022